Changes

m
no edit summary
Line 12: Line 12:  
##Online or local stores, some common places are below.
 
##Online or local stores, some common places are below.
   −
== Building a bill of materials (BOM) ==
+
==Building a bill of materials (BOM)==
Your project BOM will include all components necessary to build your <u>final</u> product. Based on that list you will be able to tally your product cost. You may have other items that are necessary to test your different prototypes however. For example you may need a breadboard to test a prototype but that will not be included in the final product, the breadboard would then be included in your list of equipment but not your bill of materials.
+
Your project BOM will include all components necessary to build your <u>final</u> product. Based on that list you will be able to tally your total product cost. You may have other items that are necessary to test your different prototypes however. For example you may need a breadboard to test a prototype but that will not be included in the final product, the breadboard would then be included in your list of equipment but not your bill of materials.
   −
# Don't forget to add links to each item
+
#Don't forget to add links to each item
# Don't forget the taxes
+
#Don't forget the taxes
# Don't forget the shipping
+
#Don't forget the shipping cost
# Don't forget to include costs of 3D printing or laser cutting materials, estimates can be found from https://makerepo.com/print_orders/index_new
+
#Don't forget to include costs of 3D printing or laser cutting materials, estimates can be found from https://makerepo.com/print_orders/index_new
    
==Online and Local Stores==
 
==Online and Local Stores==
MakerRepo Administrators, MakerRepo Staff
756

edits